Construction Estimating & Bid Control Manual: A Contractor's Field Guide to Accurate Takeoffs, Costing, Overhead, Markup, Closing, Change Orders, and Estimate-to-Actual Job Costing

Priser från
1.005,41

Utvalda

JäMFöR ALLA WEBBUTIKER (1)

Beskrivning

Construction Estimating & Bid Control Manual: A Contractor's Field Guide to Accurate Takeoffs, Costing, Overhead, Markup, Closing, Change Orders, and Estimate-to-Actual Job Costing

Jämför webbutiker (1)

Shop
Pris
1.005,41 kr
Beskrivning (0)

Construction Estimating & Bid Control Manual: A Contractor's Field Guide to Accurate Takeoffs, Costing, Overhead, Markup, Closing, Change Orders, and Estimate-to-Actual Job Costing


Produktspecifikationer

Märke Independently Published
EAN
  • 9798191984438

Utvalt Val
1.005,41 kr
Til butik